FlexPipe Systems High Voltage Distribution and Transformer Installation
Client: FlexPipe Systems
Contract Overview
Start Date: August 2015
End Date: December 2016
Contract Value: $400,000 – $600,000
Sub-Contractors & Project Roles
TNA Concrete, Concrete Pads and Bases for Equipment
Eagle Masonry, Construct Switch Gear Blast Room
MCR Crane and Rigging, Place Equipment in Place.
Scope of Work
- Install 4000amp distribution switch gear
- Trench and Install duct bank
- Pull and terminate 15kv cable
- Install a 3.5mva transformer
- Drill piles at 6 meter’s for a pour in place transformer pad
- Pull 750kcmil copper conductors
- Test low and high voltage cables
- Design a blast proof concrete switch gear room
- Perform as General Contractor, working directly for Platinum Engineering and FlexPipe Systems