KATHLEEN ANDREWS TRANSIT GARAGE

PROJECT OVERVIEW

The City of Edmonton required a closed-circuit television (CCTV) integration and backbone fibre connectivity within a new bus maintenance facility – the Kathleen Andrews Transit Garage. The solution required greater consistency and quality for camera maintenance, connection, and monitoring ability.

KATHLEEN ANDREWS TRANSIT GARAGE

CHERMIK ENGAGEMENT

Chermik was engaged for a number of reasons. The first being we are the current maintenance contractor for Edmonton Transit’s communications systems. Second, Chermik was initially engaged as a subcontractor through an electrical subcontractor on the project. When the subcontractor was removed from the project, the General Contractor (Graham Construction) engaged Chermik directly due to our:

  • Ability to keep the communication open and bridge any gap between the various contractors, including the new electrical contractor when engaged.
  • Company mentality of “collaborate and support” while continually providing high-quality solutions to advance the fibre market in Edmonton in a cost-impactful manner.
KATHLEEN ANDREWS TRANSIT GARAGE

CHERMIK CONTRIBUTIONS

The Kathleen Andrews Transit Garage provided a unique challenge for both the City and Chermik, allowing for true innovation, growth, and opportunity for the future of transit connectivity. Since project completion, the client has experienced:

  • The reality that powered fibre does work, including at long distances, allowing for modularity and scalability.
  • Additional support through existing partnerships with product manufacturers.
  • A unique solution for CCTV by utilizing the powered fibre infrastructure, allowing for once centralized “head-end” for all facility, cameras, providing a more cost-effective solution overall.
  • Improved confidence for ETS to consider, implement, and execute more “out of the box” solutions.
  • Greater possibility mindset evidenced by requesting this type of solution is incorporated on future projects.

Key Project Stats

IP POE Cameras installed: 94

Powered fibre cable installed: 9700m

Media converters used: 32

Ready to put our team to work for you? So are we! Call today!

we’re ready to
work for you.

Office Address

137, 65 Chippewa Road

Sherwood Park, AB, CA  T8A 6J7

Ph: 780-417-1487

Fax: 780-417-2158

Email: General Inquiries

Email: Employment

  • This field is for validation purposes and should be left unchanged.
COMMITTED TO SERVICE

CHERMIK TECHNICAL SERVICES

Defining new standards of quality and connection.